Client & Owner:
|
Water and Power Development Authority (WAPDA)
|
|
Description of Works:
|
Embankment of existing lake (8,000 ft above the sea level) to create a reservoir
for irrigation, water supply and power generation. Construction of Civil Works &
Hydraulic Steel Works for the Dam & Powerhouse comprising, Dam, Spillway, Coffer
Dam, Outlet & Intake Structures, Box & Circular Conduits, Control Tower & Stilling
Basin, Two Power Houses, Headrace, Fore Bay, Spill Channel, Penstocks, Gates, Trash
Racks and Stop Logs.
|
|
1. MAIN COMPONENTS
|
|
|
a) Dam (Type: Earth Fill):
|
Height : 128 Ft.
Length : 650 Ft.
Top Width : 30 Ft.
|
|
b) Spillway:
|
Length : 1,075 Ft.
Width : 50 Ft.
|
|
c) Command Area:
|
Left Bank Canal : 8,119 Acres
Right Bank Canal : 2,012 Acres
CCA : 10,131 Acres
|
|
d) Length:
|
Left Bank Canal : 59,000 Ft.
Right Bank Canal : 30,000 Ft.
|
|
Man-hours:
|
2.4 million
|
|
Peak manpower :
|
450
|
|
Completion :
|
September 2006
|