Overview of HRD
Careers
Fresh Graduate Induction
Fresh Graduate Training
Apply Online
Employee Login
Ex Descon Employees
Company Profile
Vision and Mission
Group Companies
Engineering
Procurement
Construction
Plant Maintenance
EPC
Overview
Product Range
Facilities
Oil and Gas
Infrastructure
Chemical / Petrochemical
Fertilizer
Cement
Power
Tanks
Water
QHSE At Descon
Corporate Social Responsibility
QHSE Awards
QHSE Links
JGC-Descon
Presson Descon Intl.
Olayan Descon
Clientele
What Our Clients Say
Sector
Infrastructure
Descon Headquarters
Housing Complex
Mangla Dam Raising Project
Mirani Dam Project
Contract Package 3B; Construction of Part of Islamabad – Peshawar Motorway (M-1)
Pakistan Motorway, Islamabad Peshawar Section (M-1)
SATPARA Dam – Lot C & HS
Taunsa Barrage Rehabilitation and Moderanization
Mangla Dam Raising Project Construction of Water Treatment Plant for New City
Rainee Canal Project - Contract RC-4
Construction of 8 MGD Filter Plant - Package-A (Contract No. HDP-006)
Construction of 8 MGD Filter Plant
kachi Canal Project
Oil And Gas
Chemical / Petrochemical
Fertilizer
Cement
Power
Tanks
Water
Mangla Dam Raising Project Construction of Water Treatment Plant for New City
Client:
Water and Power Development Authority, Pakistan
Owner:
WAPDA
Location:
Pakistan
Description of Works:
Construction of Water Treatment Plant for New City on EPC Basis. Scope of Work includes the following:
Cascade Aerators with Control Value and Flow Metering.
Rapid Gravity Sand Filters and experimental Anthracite to Filter Bed, complete with all Piping, Valves and Fittings, Filter Nozzles, False Filter Bottoms, Filter Media and Control Consoles for Auto-Operation of Filter Valves.
Machine House complete with Back Wash Pumps, Air Blowers and Overhead Traveling Crane
Complete Plant Water Supply System with all Piping and Fittings
Instrument Air System with all Piping and Fittings
Chemical House with all the equipment for Preparation and Dozing of Lime
Chlorination House equipped with Dozing Facility of Chorine, Booster Pumps, Valves and Fittings.
Complete Laboratory and Testing Equipment
Instrumentation and On-line Monitoring of Water Quality and Flow.
Electrification, Painting and / or Repainting of all Exposed Parts.
Setting to Work, Excavation and Backfilling.
Construction of all the Civil Works of the Plant including Internal Roads and Drainage System.
Man-hours:
0.53 million
Peak Labour Force:
160
Completion:
October, 2007